State Act
51
Section 51. Contingency plan for prevention and control of pollution.
THE ASSAM INLAND WATER TRANSPORT REGULATORY AUTHORITY ACT, 2018 (SINGLE DOCUMENT)
Act no. 27 of 20182018In forceAssam (State Act)
51. The operator of a port, dock, terminal, or a loading and unloading place and relevant operating units shall have approved contingency plan for preventing and controlling of pollution caused by vessels and their relevant operations to inland waters environment and organize drills at least once a year, and maintain proper records thereof.